Core Rules - v1.5
|
↕ 0 earlier rules
|
|
| 404. |
Determine Total Cost > |
| 404.1. |
Determine the base cost of the Ability. > |
| 404.1.a. |
Activated Abilities will have a cost listed before the “:” in their text. > |
| 404.1.b. |
Triggered Abilities will typically not have a base cost associated with them when placed on the chain due to their conditions. > |
| 404.1.b.1. |
If a Triggered Ability has a cost within instructions (e.g. “[do X] to [do Y]”), the cost is taken as the base cost. > |
|
See rule 204.3. for more information on costs within instructions. > |
|
| 404.2. |
Apply cost increases and decreases as a result of choices made in the prior step. > |
|
↕ 3508 later rules
|
|